speeding up subway expansion

I don’t really want to translate this one, I’ve done far too much public transport lately, but this article in TBN says planning work on four new subway lines has started and two more will begin construction this year. Those to enter the planning stages are lines 3, 11, 12 and 16, while lines 7 and 14 are those to begin construction by the end of the year. Line 15 and the Fangshan line might also begin construction. What strikes me as being the key point, though, is that subway expansion is to be sped up.

But to be honest, I’m feeling too lazy to read the whole article in detail, let alone translate it. Sorry.

About the Author

wangbo

A Kiwi teaching English to oil workers in Beijing, studying Chinese in my spare time, married to a beautiful Beijing lass, consuming vast quantities of green tea (usually Xihu Longjing/西湖龙井, if that means anything to you), eating good food (except for when I cook), missing good Kiwi ale, breathing smog, generally living as best I can outside Godzone and having a good time of it.

You may also like these